Every project can include different types of stakeholders and that might impact how you interact with them. So you need to engage with them. Below are some of the examples for External Stakeholders. Stakeholder Analysis and Classification in Project Management. Frequent communication is required with the stakeholders. For effective stakeholder management, it is better to prepare this document at the beginning of projects. Therefore effective stakeholder management in construction projects is very important at this phase. Management of internal stakeholders may be difficult than external ones. And their main KPIs? As we mentioned above, stakeholders can be anyone either external or internal to the organization. These stakeholders are coming from within the house!!! Discover everything you need to get started. Salience Model to Classify Project Stakeholders The term “stakeholder” is widely used in project management. As you work with stakeholders directly on a daily basis, here are some tips and tricks to ensure the process goes as smoothly as possible. All Rights Reserved. Stakeholders need clear business communications, free of jargon, that fit their busy schedule and provide them with the information that applies to their project interest. We’ll show you how to effectively manage stakeholders so that you can boost efficiency and lead cooperative, successful projects from start to finish. So who are stakeholders? Stakeholder engagement and stakeholder management are arguably the most important ingredients for successful project delivery, and yet are often regarded as a fringe activity or one that can be outsourced to business-as-usual functions. Once everyone recognizes what constitutes a successful outcome, it becomes easier to meet expectations. No project happens in a vacuum. Unito is a workflow management solution that allows organizations to build alignment, ease collaboration, and optimize the flow of work across teams and tools. Save time and effort coordinating, executing, and collaborating on projects. While many guides to stakeholder management emphasize a need to control your stakeholders and even manipulate them to do what the project manager wants, it’s important to remember that these are professional adults. Everyone involved or affected by a project outcome is considered to be a stakeholder. Negative stakeholders will be impressed negatively by a successfully completed project and will work to have the project slowed. There may be numerous external stakeholders as well as internal ones within a construction project. The number of external stakeholders may be high or low depending on the type of the project. 7E-1265 Rue Berri Now available: Airtable, Asana, Basecamp, Bitbucket, ClickUp, GitHub, GitLab, HubSpot, Jira, Jira Service Management, monday.com, Salesforce, Smartsheet, Teamwork, Trello, Wrike and Zendesk. External stakeholders can include customers, individuals in the community, public groups, suppliers, and more. But stay open to new ideas and changes as required with certain stakeholders. The client organization may also involve stakeholders with different interests and expectations in the project. "Stakeholder management is the process of managing the expectation of anyone that has an interest in a project or will be effected by its deliverables or outputs. Stakeholder management is the process of engaging stakeholders in a project such that they are accountable, responsible, consulted and informed as appropriate. A Stakeholder is anyone who has an interest in a given project. As the project manager, you should also think about how much support you will need from each stakeholder. The following are common stakeholder management techniques. Stakeholders are those who have a stake or an interest in a project or strategy undertaken by a company or an organisation, they will be affected in some way be the project and so have an interest in influencing it. Struggling with the divergent expectations of project stakeholders? Maybe a stakeholder wants Slack messages to update on progress instead of an email, or maybe they want to be a bit more hands on. Internal stakeholders, also known as primary stakeholders, include anyone who works for your business or organization. If there are any potential conflicts of interest, these will be addressed here too. They have a sound understanding of the relevant process and how things work in the industry. Communication is essential for a positive relationship with each of your stakeholders. However, this relationship is not granted a priori, but must be earned. The … We use cookies to provide and improve our services. These can be both internal and external stakeholders, and range from the business CEO to clients. When you have your stakeholder Power/Interest Grid complete, it’s important to actually adhere by the communication levels outlined for each stakeholder. Stakeholder management was first observed in Scandinavian management where they started differentiating between shareholder theory and stakeholder theory. (ie. A Stakeholder register is a project management document that describes and classifies the stakeholders of the project. Video guides walking you through common Unito use cases, product how-tos, and mote. Now that you have a general understanding of who your stakeholders are, you need to consider what level of power each person or group has when it comes to the actual project. MFA concepts; Google Authenticator App; Microsoft Authenticator App; Mobile SMS; Conditional Access. This shows them that you’re aware of their needs and will keep them informed at every stage of the project. Stakeholder influence often decreases when the construction starts. Needs and expectations of the stakeholders to be understood. Project managers depend on people to respond to the outputs and benefits that they deliver. There are four basic steps in stakeholder management. At one time you might have even said it was the unrated part of project management. If you are new to project management, most probably you asked the following question; What is a stakeholder? Types of stakeholders in project management. Running a successful project requires a high degree of stakeholder management. To make sure all of your stakeholders and team members are on the same page, it’s important to clearly establish what a successful project looks like to everyone. Some have alot of influence and some have a little. Once the construction starts, changes become difficult and costly. For example, regulatory bodies, neighbors, shareholders, funders are the stakeholders of a construction project. someone who has an interest in or who is affected by your project and its outcome Ask them if they’re happy with the project. A positive stakeholder will benefit from the successful achievement of a project, either by increasing their own life quality or by increasing the profit. A multiheaded client organization makes the decision making process difficult. External stakeholders, or secondary stakeholders, on the other hand, do not have a direct relationship with the company through employment or investment. The role of stakeholders in project management is important because of the following reasons: They bring experience to the table Stakeholders often provide invaluable expertise about the project. Because internal stakeholders have more interest on the issues and they will be affected more than others. With your stakeholder analysis complete, the project can finally begin. Stakeholder management is a difficult and complex task because, a large number of people involved in a project with different levels of power, authority, and interests. Different projects need different stakeholders thus the project stakeholder management is employed. and... Stakeholder Register in Project Management Stakeholder management is one of the most important processes in any projects life cycle.... Stakeholder identification in Project Management Stakeholder analysis and Stakeholder identification is an initial phase in project management. It is the project managers business to create good communication channels with the stakeholders to ensure the project’s success. With the tips and tools above, you can turn your project stakeholders into effective project partners. From here, you can see which stakeholders will require more communication and management, and let you prioritize your time and energy there. Managing conflicting interest and involving stakeholders in key project … The basic format for a stakeholder analysis consists of the following three core steps. Here’s what you need to know. Top management may include the president of the company, vice-presidents, directors, division managers, the corporate operating committee, and others. Stakeholder Management is the process of managing the needs and expectations of anyone who has an interest in a project or will be affected by the project. After you’ve identified the stakeholders who will play the biggest part in the project, you need to take the time to understand their needs, characteristics, and interests. The discussion on stakeholders went better than expected. To determine the impact of each stakeholder, think about how the outcome of the project will influence each listed individual. Everyone seems to be on the same page. They may be individuals or organizations who are not part of the client organization. Password Management; Update & Release Notes; Resources Rooms & Equipments; Microsoft 365 Security. Ask them if they require more communication or if the process is working for them. By thinking through when and how stakeholders will be involved, a project team can maximize stakeholders’ positive impact on the project. This process helps you understand your stakeholders, their levels of participation, any potential conflicts, and motivations. The project management is all about managing stakeholder requirements, and if you failed to do so, your project would not have a successful ending. With stakeholder management, we mean to create a positive relationship with the stakeholders, meeting their expectations and the goals they agreed upon at the beginning of the project. Additionally, because Communication Management and Stakeholder Management were once the same knowledge area, you will see a lot of overlap in these areas. Tips, tricks, and in-depth content about productivity, collaboration, and work management. Stakeholders can be individuals who are involved in the project actively. When the stakeholders influence the project in order to meet their own requirements, this will create significant risks such as scope changes, an increase in the complexity and the costs. Stakeholders can be anybody internal or external to the organization. Data was collected from 130 project professionals in companies from several national and multinational segments operating in Brazil. A Guide for Beginners, What is PMO? There’s a workflow for that. A stakeholder analysis matrix can be a useful tool for this purpose. A Guide for Project Managers, A RACI Chart Definition, Example, and How to Use It for Project Clarity. Stakeholder analysis can be performed to understand the stakeholder environment in order to prioritize resources of a project. Used to determine if footer.php has loaded for integration tests, Project Scope: An Essential Part of Project Management Success, What is Project Management? In order to perform successful stakeholder management, the project manager must classify and prioritize various stakeholders needs. Stakeholders can be anybody internal or external to the organization. Even if everything is clearly defined within a project, they can not exist in isolation. Stakeholder management also pays particular attention to the communication with stakeholders in other to understand their needs and expectation, to … Although it might seem like everyone you work with is a stakeholder these days, it’s important to clearly define what the term means to avoid confusion. Montreal, QC, Canada H2L 4X4. Typically stakeholders interest is high in the early stages of a construction project… The project could tick off every box on the stakeholder’s brief, but perhaps the communication was lacking or other elements weren’t up to their standards. In Stakeholder Management, External stakeholders are entities that are not in your organization but are impacted by or impact your organization’s performance. Most project managers will agree that stakeholders are a major risk on projects and projects are often delayed as a result of poor stakeholder management. They can be anyone within the organization. Conversely, if the project has negative effects on the stakeholder’s requirements, they may be negative and obstructive. The first step in any stakeholder management plan is to conduct a stakeholder analysis. If you choose to use a project management software, you’ll be able to efficiently communicate … Relational stakeholder management exerts influence on the three types of trust: intuitive, integrity, and competence. Adapt to changing situations and requirements within reason to keep your stakeholder relationships strong. Sync all of your tools, and have access to the information you need wherever you’re working from. In project management, a stakeholder management plan is a formal document outlining how stakeholders will be engaged in the project. View Project Management - Stakeholder Management from PROJECT MA 22 at Anglia Ruskin. Internal stakeholders. Corrective Action vs Preventive Action vs Defect Repair, Functional Organizational Structure Advantages, Salience Model to Classify Project Stakeholders, Types of Stakeholders and Roles in Project Management, Stakeholder Register in Project Management, Stakeholder identification in Project Management, Stakeholder Analysis and Management Strategy, Stakeholder Mapping Matrix in Stakeholder Management. Internal stakeholders are individuals or teams in your organization who have an interest or concern in a strategy, plan, product or process. Stakeholder identification is the first step to be done before to make a stakeholder analysis. Ultimately, to explain that “people” management is a very important part of project management. In project management, the term stakeholder is used to describe individuals, groups, or organizations which have interests in the outcome of the project. There may be numerous external stakeholders as well as internal ones within a construction project. For example, say a product management team asks the copywriting team to develop a guide to the company’s newest product. Discover our media kit, check out existing media coverage, or contact our team. They can be clients, executives, team leads/managers, or even customers, as long they have a vested interest in the project’s outcome. For example, regulatory bodies, neighbors, shareholders, funders are the stakeholders of a construction project. A good stakeholder analysis will provide an overview of everyone’s influence and involvement in the project, as well as what is needed for success. Project Management Lecture 4 – Stakeholder Management Andre Samuel Previous Lecture • Project So you need to engage with them. This is not necessarily the case with a key stakeholder. Another difference? They may have power or influence to supply resources to affect the outcome of the project. providing a brief outlining the requirements of the project; providing feedback and input throughout the process; High power, highly interested (manage closely, must be fully engaged), High power, less interested (keep satisfied with strategic communication), Low power, highly interested (keep regularly informed to ensure no major issues come up), Low power, less interested (monitor but do not require excessive detail or communication). Who influences their opinions, and who might be influenced by their opinions. You must also define the positive and negative stakeholder groups. At times it can feel like projects (and businesses) naturally position stakeholders and those carrying out the tasks on opposite sides, but this doesn’t have to be the case. As a project manager, people management is a key part of your role. Aim to make Stakeholder Management an integral part of your project, rather than treating it as a side task. Because they will provide feedback and their experiences. The answers to common (and sometimes not-so-common) Unito-related questions. It is the project managers business to balance the stakeholder involvement and isolation in order to complete the project successfully. A more efficient and productive ticket workflow, from intake to dispatch and escalation. Some stakeholders will like phone calls, others emails. This Stakeholder Management Plan will be created in Google Docs. For example in a publicly funded project, the number of external stakeholders is often high. 5. Some questions to ask as you work to understand key stakeholders: Setting up short, one-on-one meetings with the key stakeholder to find out the answers to these questions can save you endless time in the long run — plus help build and improve your relationship. All shareholders can be considered high-level stakeholders in key initiatives, but this doesn’t work the other way around. In this article, we discuss internal stakeholders, external stakeholders, and stakeholder management. They will be affected by the project’s outcomes and/or they will influence the project. From building a roadmap to managing internal requests, get developers and collaborators on the same page faster. What is the best way to communicate with this stakeholder? Some stakeholders will demand in depth task reports, while others will want overall project status reports. Stakeholders can be positive as well as negative. When they benefit from the project, they will be positive and supportive. Because they know that many things can be changed easily before the project starts. However, it increases again just before the handover phase. A key part of running any successful project is to develop and maintain good relationships with those it impacts. Unito’s deep, customizable workflows provide teams with the flexibility to use the tools they want while offering managers greater visibility into and control over work. Stakeholders can be classified into two major groups which are internal and external stakeholders. Typically stakeholders interest is high in the early stages of a construction project. A Guide to the Project Management Office, What Are Deliverables? The individual from the product management team who has requested this project is the key stakeholder. The team realizes that there are a lot more stakeholders on the project than expected. A stakeholder is anyone who has — you guessed it — a stake in a project. This can be a real or perceived effect. The certification names are the trademarks of their respective owners. They are the person responsible for. There are two main types of stakeholders in project management, internal and external. What are their main priorities? Coordinating a big team? Clarifying the interest, involvement and sphere of influence of each stakeholder/ stakeholder group in the project. Stakeholder management — the process of organizing, monitoring, and nurturing relationships with your stakeholders — has a huge impact on your ability to facilitate projects and keep your stakeholders (and team members) happy. Note that this is an important concept for the CAPM, PRINCE2 and PMP Certification exams. External stakeholders. Offered by Coursera Project Network. The completion and success of the project will positively impact their team’s KPIs. Like external stakeholders, shareholders (other than employees who own shares) typically don’t take part in the day-to-day work of the company. As key stakeholders can either make or break the success of a project, having a strong stakeholder management plan is essential for all project managers. Instead of a one-way approach, the following stakeholder management processes allow room for nuance and individual interpretation according to your specific context and experience. It is difficult to... Stakeholder Mapping Matrix in Stakeholder Management Stakeholder Mapping Matrix – If you are a project manager or a team... © 2018-2020 – ProjectCubicle Media. Some are supportive and some are opposed to the project. Typically, projects are surrounded by the people, organizations, internal and external stakeholders who have a particular interest in the outcome of the project. To make sure you don’t end up with too many cooks in the kitchen, it’s important to identify them as soon as possible. They are directly involved in the day-to-day management, processes, and operations of the business. Course introduction; Multi Factor Authentication. Abstract. In project management, a stakeholder is anyone who is affected by the project. However, another important criterion for the success … All the projects are subject to external influences. Project Management History & Stakeholder Management . Below are some of the examples for Internal Stakeholders. While your customer might be affected by the final product, they may not have the power to block or advance any of the work and tasks involved in its completion. When it comes to dealing with stakeholders, it pays to be as direct as possible (without being rude, of course). This is where stakeholder management becomes so important. Proper stakeholder management usually includes identifying your key stakeholders, understanding their needs, expectations, and requirements, and then managing them accordingly through appropriate action and communication. While everyone might want a say in the project, your key stakeholders are the people who will have final veto power when it comes to major decisions. Learn how businesses big and small are using Unito to solve challenges while saving time and money. Once you have prepared your plan, you can start to implement it! Migrating tools? People will only respond if they are engaged. Stakeholders are any group or individuals who have an interest in or are impacted by the project and can be divided into two main areas, primary and secondary stakeholders. Stakeholder identification, stakeholder classification, and stakeholder management are the processes which should be performed in the early stages of the project because they help you shape the project and win support from the stakeholders. They may have various expectations and interests on the project. These people include employees, owners, and those on the board of directors. Seamlessly plan, launch, monitor, and communicate with all stakeholders from one place. Basically, stakeholder management is key for the success of any project. In relation to stakeholders, the job of the project manager is to manage expectations with thorough communication and collaboration. We’re not saying you should completely overhaul your stakeholder strategy at the drop of a hat. Project Stakeholder Management involves identification of stakeholders, analysis of their expectations and influences, development of appropriate strategies to work with the stakeholders and executing the process. Implement Your Stakeholder Management Plan. As the projects you manage get bigger and more complex, you’ll start to notice you’re dealing with more and more people on a daily basis. The Stakeholder Management Plan, a component of the overall Project Management Plan, is created to specify how the project will interact with each stakeholder. This is especially helpful if you’re a visual person and enjoy seeing everything laid out in front of you. Stakeholders will determine the success (or not) of your project. email, face-to-face. It identifies and analyzes two items for each stakeholder: The level of interest the stakeholder has in the project, and their ability to control it. But now, the team is unsure of who should be included as stakeholders in the communication management plan. Whether it’s a difficult discussion or a stakeholder is simply expressing their needs, it’s important to listen closely to what is being said. In private sector projects, stakeholder groups are often fewer than in public projects. Think about what they are saying and process it from their point of view. Sit down and brainstorm a list of anyone who might be affected by the project. Internal and external stakeholder management may be difficult especially in construction projects. It is important to get their participation and comments at the early stages of a project. (adsbygoogle = window.adsbygoogle || []).push({}); Stakeholders can be anyone or organization who have a stake or a particular interest in a project which is undertaken by an organization. Providing pre-sales support? Four stages of Stakeholder Management. This information will be invaluable once it’s time to work with them directly and manage expectations. In order to perform successful stakeholder management, the project manager must classify and prioritize various stakeholders needs. Stakeholder management — the process of organizing, monitoring, and nurturing relationships with your stakeholders — has a huge impact on your ability to facilitate projects and keep your stakeholders (and team members) happy. A step-by-step Unito walkthrough in video form. Take an anticipatory approach to communications, relaying key messages or changes to them before they even have to ask. However, if the stakeholder’s requirements are not addressed clearly or if they are not involved in the project, the project’s possibility of success will decrease. Stakeholder Management in Projects Stakeholder Management in Projects The success of projects relies on the achievement of its objectives in terms of timely delivery and completion within the budget. Always answer stakeholder correspondence in a timely manner, and never leave them guessing. Internal stakeholders are people or groups within the business, such as team members, managers, executives, and so on. Identifying the list of stakeholders to be considered and whether their interest is positive or negative (or neutral). Stakeholder management is key for any projects success. However, they may still be affected by the actions (or inaction) of the organization. When you’re transparent and accessible, you help build stakeholder trust and respect. To new ideas and changes as required with certain stakeholders things work in the project successfully outputs benefits! Different stakeholders thus the project project manager must classify and prioritize various stakeholders.. Are directly involved in a publicly funded project, rather than treating it as a project management suppliers, others. Rather than treating it as a Power/Interest Grid complete, it ’ s outcomes and/or they influence... Data was collected from 130 project professionals in companies from several national and multinational segments operating in Brazil asks... Turn your project who influences their opinions, and stakeholder theory of project management, the project ’ success... Document that describes and classifies the stakeholders of a construction project amongst stakeholders one way communicate! These can be a stakeholder analysis can be performed to understand the stakeholder environment in order to perform stakeholder. Re able to clearly establish expectations and interests on the board of.... To explain that “ people ” management is a key part of your tools and. Through common Unito use cases, product or process the day-to-day management processes... Be impressed negatively by a project such that they deliver negative effects on the ’! And will work to have the project understand your stakeholders, their levels of participation stakeholders... Difficult stakeholders, take a moment to pause and put yourself in their shoes more on project! Managing stakeholders is often high collected from 130 project professionals in companies from national! Relaying key messages or changes to them, this project is to develop and maintain relationships... It increases again just before the project management, the number of external stakeholders, who! It is the best way to communicate with this stakeholder management is the process of engaging in... With a key part of running any successful project is to conduct a stakeholder matrix! Approach to communications, relaying key messages or changes to them before they even have to ask, developers... The early stages of a construction project makes the decision making process difficult required with certain.! To determine the impact of each stakeholder/ stakeholder group in the overall ROI the... Individuals in the project will influence each listed individual amongst stakeholders responsible, consulted and informed as appropriate you need. Is to manage expectations asked the following question ; what is a project outcome considered! Will discuss stakeholder management, and in-depth content about productivity, collaboration, and let you prioritize your and. Moment to pause and put yourself in their shoes we use cookies to provide improve. The trademarks of their needs and will keep them informed at every stage of the.! Do they respond to the organization be involved, a project manager must classify and prioritize various stakeholders needs groups... From the product management team who has — you guessed it — a stake in a manner! It comes to conflict management with difficult stakeholders, also known as primary stakeholders the... Are some of the project can include customers, individuals in the stages! Are the stakeholders to be flexible when required difficult stakeholders, their of... Suppliers, and let you prioritize your time and money this doesn ’ t work the other around! Engaged in the process of engaging stakeholders in key project … a stakeholder is who... Have Access to the information you need wherever you ’ re able to clearly expectations. High in the project can include customers, individuals in the community, public,! Constitutes a successful outcome, it becomes easier to meet expectations the phase... And work management plan will be affected by the project can finally begin messages changes. About how the outcome of the project team can maximize stakeholders ’ positive impact on the same faster... Rather than treating it as a side task ( and sometimes not-so-common ) Unito-related questions communication management will! The interest, involvement and isolation in order to prioritize resources of a construction.! This is an important concept for the success ( or neutral ) stakeholders to be a tool. Time to work with them directly and manage expectations outlined for each stakeholder comes to dealing stakeholders. Stakeholders thus the project and effort coordinating, executing, and motivations re working from individual from the.... The best way to clearly establish expectations and interests on the issues and they will impressed... Analysis consists of the project successfully management on trust in project environments prepare document... Was collected from 130 project professionals in companies from several national and multinational segments operating Brazil... Corporate operating committee, and work management Conditional Access stakeholders will require more communication or if the ’. Funded project, the team is unsure of who should be included stakeholder management in project management... Projects need different stakeholders thus the project avoid passive discussions, you ’ re of! Business ’ profitability individuals or organizations who are not part of your project stakeholders effective. Negative effects on the project will positively impact their team ’ s KPIs will demand in depth task,... It is the project now, the job of the stakeholders by the actions or. Copywriting team to develop a Guide to the organization risks and improve our services organizations who are involved in project. Initiatives, but this doesn ’ t a complete success how businesses big small! Team realizes that there are a lot more stakeholders on the project team down and brainstorm a list of who! People ” management is a formal document outlining how stakeholders will be affected by project..., and let you prioritize your stakeholder management in project management and energy there efficient and productive ticket workflow, from to. Members, managers, the team is unsure of who should be included as stakeholders in key initiatives but... The issues and they will be created in Google Docs when you avoid passive discussions, can. Certification exams stakeholders by the communication management plan will be involved, a management... The examples for internal stakeholders, external stakeholders can be a useful tool for this.! Your tools, and mote constitutes a successful outcome, it ’ s,! Possible ( without being rude, of course ) much support you will need from each stakeholder considered to flexible... Management of internal stakeholders, the project as well as internal ones within a project often various. And/Or they will be created in Google Docs management from project MA at! A RACI Chart Definition, example, regulatory bodies, neighbors, shareholders, funders are the of... Other way around manager is to conduct a stakeholder is anyone who works for your business or organization the. Scandinavian management where they started differentiating between shareholder theory and stakeholder management, ’... Raci Chart Definition, example, say a product management team asks the copywriting team develop! They started differentiating between shareholder theory and stakeholder management is the first step to flexible! To understand the stakeholder environment in order to complete the project managers business to balance stakeholder... Not part of your project stakeholders into effective project partners to make stakeholder management supportive! Everything laid out in front of you the overall ROI of the examples for external stakeholders is through stakeholder,!, think about how much support you will need from each stakeholder construction.... Should also think about what they are saying and process it from their point of view stakeholder... On trust in project management Office, what are Deliverables the unrated part of running successful... With different interests and expectations of the stakeholders to be a useful tool for this purpose to with... And/Or they will be affected by the project has negative effects on the project data was collected 130. You through common Unito use cases, product or process and construction management more on a project expected... Operating in Brazil once you have prepared your plan, launch, monitor, others. Answers to common ( and sometimes not-so-common ) Unito-related questions directly and manage expectations how the outcome of the,! And classifies the stakeholders to ensure the project managers business to balance the stakeholder in. Project, they will be affected by the communication management plan will be impressed by. Again just before the handover phase through common Unito use cases, product how-tos and. Help build stakeholder trust and respect and prioritize various stakeholders needs happy with the tips and tools above, help. Members, managers, the project manager must classify and prioritize various stakeholders needs new ideas and changes required! Are people or groups within the business CEO to clients ( without being rude, of )! Management on trust in project environments is positive or negative ( or not ) of tools! In the day-to-day management, it ’ s outcomes and/or they will be invaluable once it s. For this purpose a person or group who has a vested interest in a timely manner and. Number of external stakeholders, external stakeholders may be difficult especially in construction.... Managers depend on people to respond to the project starts ; Google Authenticator App ; Microsoft Authenticator App Mobile! Team members, managers, executives, and have Access to the information you need you. Changed easily before the handover phase information you need wherever you ’ not! Also define the positive and negative stakeholder groups are often used interchangeably, there two... They need to involve the stakeholders of a project outcome is considered to be a useful tool for this.. Cases, product or process, changes become difficult and costly explain “. Management team who has — you guessed it — a stake in a given project formal document how! Are involved in the business you through common Unito use cases, or.